![]() ![]() The facility will be used for recreational sports and will be available for Ave Maria students and local residents. It will include electricity to provide lighting for evening activities and 83 parking spaces. ![]() ![]() The third project is Judi’s Gym, a pre-engineered, 12,320-square-foot pavilion that includes three covered basketball courts, which also will be lined for volleyball and pickleball. The Field House is home to Ave Maria’s men’s basketball, women’s basketball and volleyball teams, as well as the sports medicine and strength and conditioning programs.Īcross the street and adjacent to Gyrene Field, DEC Contracting Group is constructing the 5,440-square-foot pre-engineered Quonset Locker Facility, a military hangar-inspired structure that will include locker rooms, restrooms, and showers for Ave Maria’s outdoor sports programs. It will be rebuilt with new roofing, HVAC, electrical and plumbing fixtures, and DEC Contracting Group will add locker rooms, a new playing surface, and staff offices. The largest project involves demolishing Tom Golisano Field House, a 40,000-square-foot pre-engineered metal building with a stucco exterior, down to its structural steel. The Tom Golisano Field House COURTESY IMAGE / BSSW ARCHITECTSĭEC Contracting Group is completing work on three athletic facilities to enhance student athlete performance and recreational opportunities at Ave Maria University.
0 Comments
Leave a Reply. |